Welcome

On this site I present my adventures into the hobby of narrow gauge trains, both real and scale models. The text is brief but pictures are plentiful. After all, a picture says more than thousand words ..

Latest Updates

Cableway and transporters in place. I could continue with the buildings for a bit longer, but next I want to do something else, so painting/weathering tracks will be it.

Klenshyttan - Cableway station in place

Dec 04, 2016 : Cableway and transporters in place. I could continue with the buildings for a bit longer, but next I want to do something else, so painting/weathering tracks will be it.

read more ...



Not yet finished, only balancing for the photos, but still... had to see where it leads.. Not much of the buildings left to do now. Cable station needs more plus the transporter needs to be raised, and roof n windows of course.. but not far now. Then ...

Klenshyttan - Ladders and stilts

Nov 27, 2016 : Not yet finished, only balancing for the photos, but still... had to see where it leads.. Not much of the buildings left to do now. Cable station needs more plus the transporter needs to be raised, and roof n windows of course.. but not far now. Then ...

read more ...



These last days I have continued with the cableway. Looking at the pictures below might not get much of a clue how this will be, but patience, it will reveal itself in time... Last picture shows the part of the construction which will hold it up in pos...

Klenshyttan - Carousel and the doghouse

Nov 26, 2016 : These last days I have continued with the cableway. Looking at the pictures below might not get much of a clue how this will be, but patience, it will reveal itself in time... Last picture shows the part of the construction which will hold it up in pos...

read more ...



Did the final windows today (well almost, the cableway station will need some to..). Solved the problem with the

Klenshyttan - Second batch of windows

Nov 20, 2016 : Did the final windows today (well almost, the cableway station will need some to..). Solved the problem with the "almost" perfect windows today. It turned out that the Curio cutter do not cope with the square object in these small sizes, better to draw a

read more ...



I started with the cableway last time but quickly found out that it will cover some windows, which still be visible inbetween. So today I started with the windows instead. Machine house, loco shed and roster furnace got there´s. Next time it will be time

Klenshyttan - Windows and Wingtanks

Nov 19, 2016 : I started with the cableway last time but quickly found out that it will cover some windows, which still be visible inbetween. So today I started with the windows instead. Machine house, loco shed and roster furnace got there´s. Next time it will be time

read more ...



Since last I have painted and ballasted the standard gauge in the back. Also put on roofs and painted the three side-buildings. When this was done it was time to put attention back to the front and concentrate on the cableway station on the foundry side.

Klenshyttan - The cableway

Nov 13, 2016 : Since last I have painted and ballasted the standard gauge in the back. Also put on roofs and painted the three side-buildings. When this was done it was time to put attention back to the front and concentrate on the cableway station on the foundry side.

read more ...



Just found this on the tube. Someone (not me) made a film about this place. Have a look if your interested, it is only a few minutes.

Klenshyttan - Video

Nov 05, 2016 : Just found this on the tube. Someone (not me) made a film about this place. Have a look if your interested, it is only a few minutes.

read more ...



last few days I started on the three remaining buildings, the locoshed, coalbarn and reload shelter.

Klenshyttan - Side buildings

Nov 05, 2016 : last few days I started on the three remaining buildings, the locoshed, coalbarn and reload shelter.

read more ...