Borkum Match - The Match Factory Line
This article was published Jan 24, 2016.
The distant goal of that was a distant "future" complete railway. I come to realize that "future plans" tends to never happen.. plus the third module which is on top of my workbench is much needed for other tasks, so today I started thinking of a hole concept idea there both so far built shelf modules along the wall could actually form a "start-to-end with something-inbetween railway". I do not do much running of my trains, but it do happen, so this felt much fresh and do-able.
So the idea is this, both existing modules will evolve at the same time with a bit slope uphill between each part counted from the harbour bottom left. With this I can actually run some trains with a purpose and not just back-and-forth on a small station trackplan.