BMT - Logbook February 2006

This article was published Feb 01, 2006.

Pict0765 -- Second bogie made.

the coach is coming closer..


Pict0765 -- Second bogie made.
Pict0765 -- Second bogie made.
Pict0769 -- What a beast! 40cm in length and still I removed 2 benches... if not it would have been 59cm in length.
Pict0769 -- What a beast! 40cm in length and still I removed 2 benches... if not it would have been 59cm in length.
Pict0780 -- Soldering the sides, weights are a necessity when soldering.
Pict0780 -- Soldering the sides, weights are a necessity when soldering.
Pict0782 -- First side done, one more to go.
Pict0782 -- First side done, one more to go.
Pict0784 -- Here the frame is (almost) finished and time to start think about roof and benches.
Pict0784 -- Here the frame is (almost) finished and time to start think about roof and benches.
Pict0786 -- The armless guy is siting on one of the floor planks, the benches will come a bit higher.
Pict0786 -- The armless guy is siting on one of the floor planks, the benches will come a bit higher.
Pict0790
Pict0790
Pict0791 -- a bit closer
Pict0791 -- a bit closer
Pict0795 -- Floor and side-step is added.
Pict0795 -- Floor and side-step is added.
Pict0799 -- a BIG image..
Pict0799 -- a BIG image..
Pict0803
Pict0803
Pict0808 -- Floor is stained and one side painted blue.
Pict0808 -- Floor is stained and one side painted blue.
Pict0809 -- a bit closer
Pict0809 -- a bit closer