Klenshyttan - Leveling
This article was published Sep 12, 2016.

Got a bit further this evening. Started with cutting out the rest foam sheets for the leveling. Level 0 is direct on the plywood there the middle storage building for the smeltery will go. Level 1 is the dam which gives water for the steam engine and the old waterwheel. Level 1 is also used in the back for the connection to the main line. Level 2 is for the narrow gauge and last level 3 is hillsides for the roasting furnace and engine house.