Farmers Point - Track laying 1

This article was published Dec 14, 2014.

This weekend I installed all the cables and connected the four sections.

Section A is the 9mm track and glued in place. Section B through D is the 16.5mm track and will come next, so is the control box which will be installed in the left corner there the cables comes up.

Scenery 9


2711  -- section A + B
2711 -- section A + B
2712  -- section C + D
2712 -- section C + D
2713
2713
2718  -- old fashion electric sections
2718 -- old fashion electric sections
2719  -- control box will be above the holes to the left there the cables comes up
2719 -- control box will be above the holes to the left there the cables comes up
2721  -- test run Ok for section A
2721 -- test run Ok for section A
2724  -- test run Ok for section B
2724 -- test run Ok for section B
2725  -- test run Ok for section C
2725 -- test run Ok for section C
2726  -- test run Ok for section D (sorry for the unfocused image)
2726 -- test run Ok for section D (sorry for the unfocused image)
2728  -- section A complete and working
2728 -- section A complete and working
2733  -- section A glued in place
2733 -- section A glued in place
2735  -- bridge painted and installed
2735 -- bridge painted and installed