Farmers Point - Track laying 1
This article was published Dec 14, 2014.
This weekend I installed all the cables and connected the four sections.
Section A is the 9mm track and glued in place. Section B through D is the 16.5mm track and will come next, so is the control box which will be installed in the left corner there the cables comes up.